Case Studies
Where Power Meets Performance
Explore our successful power solutions across high-profile events and major venues.
Each case study demonstrates our technical expertise, reliability, and commitment
to delivering zero downtime for critical operations.
From international summits to cultural festivals, discover how our comprehensive
power infrastructure and round-the-clock support have powered some of the region's
most significant events.
1 Billion Followers Summit
January 11-13, 2025 | Dubai, UAE
Glow Power served as the exclusive power solutions provider for the globally significant 1 Billion Followers Summit 2025, held across three iconic Dubai venues: DIFC Gate Avenue, Emirates Towers, and Zabeel Park. This high-profile event brought together digital creators, influencers, and media professionals from around the world.
Our comprehensive power infrastructure ensured uninterrupted electricity supply across all event zones. The scope included temporary power supply & distribution, generator systems with synchronization and auto load sharing capabilities, and power support for critical operations including AVL systems, broadcasting stations, F&B vendors, VIP lounges, and temporary cooling systems.
Advanced fuel management operations maintained 100% uptime with certified Fire Marshal on-site, proper safety signage, and dedicated round-the-clock monitoring - achieving a zero-incident environment throughout the event duration.
Technical Specifications
Total Power Capacity: 1.8MW deployed
Power Cabling: 2-3km across all venues
Fully synchronized generator units
Intelligent auto load sharing
Backup & redundancy protocols
Project Timeline
5 Days: Pre-event installation & setup
3 Days: System testing & rehearsals
3 Days: Live event with 24/7 support
20+ specialized technicians deployed
1.8MW
Power
3
Venues
3KM
Cabling
100%
Uptime
Animenia Abu Dhabi
October 23-27, 2024 | Abu Dhabi, UAE
Glow Power provided comprehensive temporary power and cooling solutions for Animenia Abu Dhabi 2024 at Manarat Al Saadiyat. As one of the region's premier gaming and entertainment events, the five-day festival required extensive infrastructure to support gaming zones, F&B areas, vendor booths, and entertainment systems for thousands of visitors.
Our end-to-end delivery covered primary power supply with generator synchronization and automatic load sharing, complete cooling systems using high-performance HVAC units, and comprehensive power distribution across all Manarat Al Saadiyat spaces including AVL systems, gaming zones, and vendor booths.
The Glow Power Tech Force executed the project with precision, completing installation within the allocated timeline and ensuring thorough testing to eliminate downtime risks, delivering efficient energy management through synchronized generators and automated load balancing.
Technical Specifications
Primary Power: 2.5MW electrical supply
Cooling System: 200 TR HVAC units
Power Cabling: 1-2km deployment
Generator synchronization with auto load sharing
Secondary power lines for F&B vendors
Event Coverage
Gaming & PlayStation zones
F&B areas and vendor booths
AVL systems and temporary kiosks
High-traffic and enclosed areas cooling
6 Days installation + 3 Days testing
2.5MW
Power
200TR
Cooling
2KM
Cabling
5
Event Days
E& Beach Canteen
March 27 - April 13, 2025 | Dubai, UAE
GP Rental served as the exclusive power solutions partner for the E& Beach Canteen 2025 at Kite Beach, Dubai. This vibrant 18-day family-friendly event celebrated culinary diversity and local flavors, requiring extensive power distribution across vendor kiosks, entertainment stages, and children's play areas at the scenic beachfront location.
The beachfront location presented unique challenges requiring weather-resistant installations and specialized distribution systems. Our scope included full distribution from main cable to secondary outlets, power for 40-45 F&B vendor kiosks, main performance stage with AVL systems, children's play areas, and organizers' temporary offices.
Our experienced technical team developed a detailed distribution layout ensuring balanced load allocation across all zones. The greatest challenge was dynamic power distribution to numerous F&B vendors with different load requirements, achieved through meticulous load calculation and engineering design.
Technical Specifications
Power Generation: 1.5MW with synchronization
Main Power Cables: 1.2km deployment
Secondary Distribution: 1.5km cables
Complete fuel supply & management
Load balancing for 40+ vendor kiosks
Project Execution
15 Days: Build-up and installation
4 Days: System testing & verification
18 Days: Event operation duration
Zero reported outages achieved
24/7 technical support provided
1.5MW
Power
45
Kiosks
2.7KM
Cabling
18
Event Days