1 Billion Followers Summit

January 11-13, 2025 | Dubai, UAE
Glow Power served as the exclusive power solutions provider for the globally significant 1 Billion Followers Summit 2025, held across three iconic Dubai venues: DIFC Gate Avenue, Emirates Towers, and Zabeel Park. This high-profile event brought together digital creators, influencers, and media professionals from around the world.
Our comprehensive power infrastructure ensured uninterrupted electricity supply across all event zones. The scope included temporary power supply & distribution, generator systems with synchronization and auto load sharing capabilities, and power support for critical operations including AVL systems, broadcasting stations, F&B vendors, VIP lounges, and temporary cooling systems.
Advanced fuel management operations maintained 100% uptime with certified Fire Marshal on-site, proper safety signage, and dedicated round-the-clock monitoring - achieving a zero-incident environment throughout the event duration.

Technical Specifications

Total Power Capacity: 1.8MW deployed
Power Cabling: 2-3km across all venues
Fully synchronized generator units
Intelligent auto load sharing
Backup & redundancy protocols

Project Timeline

5 Days: Pre-event installation & setup
3 Days: System testing & rehearsals
3 Days: Live event with 24/7 support
20+ specialized technicians deployed
1.8MW Total Power
3 Venues
3KM Cabling
100% Uptime

Animenia Abu Dhabi

October 23-27, 2024 | Abu Dhabi, UAE
Glow Power provided comprehensive temporary power and cooling solutions for Animenia Abu Dhabi 2024 at Manarat Al Saadiyat. As one of the region's premier gaming and entertainment events, the five-day festival required extensive infrastructure to support gaming zones, F&B areas, vendor booths, and entertainment systems for thousands of visitors.
Our end-to-end delivery covered primary power supply with generator synchronization and automatic load sharing, complete cooling systems using high-performance HVAC units, and comprehensive power distribution across all Manarat Al Saadiyat spaces including AVL systems, gaming zones, and vendor booths.
The Glow Power Tech Force executed the project with precision, completing installation within the allocated timeline and ensuring thorough testing to eliminate downtime risks, delivering efficient energy management through synchronized generators and automated load balancing.

Technical Specifications

Primary Power: 2.5MW electrical supply
Cooling System: 200 TR HVAC units
Power Cabling: 1-2km deployment
Generator synchronization with auto load sharing
Secondary power lines for F&B vendors

Event Coverage

Gaming & PlayStation zones
F&B areas and vendor booths
AVL systems and temporary kiosks
High-traffic and enclosed areas cooling
6 Days installation + 3 Days testing
2.5MW Electrical Power
200TR Cooling
2KM Cabling
5 Event Days

E& Beach Canteen

March 27 - April 13, 2025 | Dubai, UAE
GP Rental served as the exclusive power solutions partner for the E& Beach Canteen 2025 at Kite Beach, Dubai. This vibrant 18-day family-friendly event celebrated culinary diversity and local flavors, requiring extensive power distribution across vendor kiosks, entertainment stages, and children's play areas at the scenic beachfront location.
The beachfront location presented unique challenges requiring weather-resistant installations and specialized distribution systems. Our scope included full distribution from main cable to secondary outlets, power for 40-45 F&B vendor kiosks, main performance stage with AVL systems, children's play areas, and organizers' temporary offices.
Our experienced technical team developed a detailed distribution layout ensuring balanced load allocation across all zones. The greatest challenge was dynamic power distribution to numerous F&B vendors with different load requirements, achieved through meticulous load calculation and engineering design.

Technical Specifications

Power Generation: 1.5MW with synchronization
Main Power Cables: 1.2km deployment
Secondary Distribution: 1.5km cables
Complete fuel supply & management
Load balancing for 40+ vendor kiosks

Project Execution

15 Days: Build-up and installation
4 Days: System testing & verification
18 Days: Event operation duration
Zero reported outages achieved
24/7 technical support provided
1.5MW Power Generation
45 Vendor Kiosks
2.7KM Total Cabling
18 Event Days